Product: Mop Set
Telescopic length: 120cm-85CM; mop barrel size: 46 * 26.5 * 23CM
Material: metal, stainless steel, fiber, plastic
Note: manual measurement there is 1-2cm error, the specific subject to prevail
Features: length of the heart to adjust, drag the ground without bending
Mop head number: 4
Mop bar load: 10kg or more
Dehydration rate: 90% (inclusive) -100% (inclusive)
Mop Bar Type: Reinforced Bar + Stainless Steel Plate
Scope: living room, kitchen, bathroom, bathroom
Precautions:
1, this package only contains the mop set, the picture does not contain any decorative items.
2, due to manual measurement size may have 1 ~ 3cm error, please understand
3, due to lighting, display / contrast settings, products and pictures have subtle chromatic aberration
100% customer satisfaction:
1,100% genuine, if you have any questions about this product, please contact us in time, we will reply you within 24 hours (including holidays)
2, transportation time 7~21 days
XUE Double drive rotary mop, household hand-free mop detachable double barrel drag handle automatic drying tray Mop set (Color : Green)
Product: Mop Set
Telescopic length: 120cm-85CM; mop barrel size: 46 * 26.5 * 23CM
Material: metal, stainless steel, fiber, plastic
Note: manual measurement there is 1-2cm error, the specific subject to prevail
Features: length of the heart to adjust, drag the ground without bending
Mop head number: 4
Mop bar load: 10kg or more
Dehydration rate: 90% (inclusive) -100% (inclusive)
Mop Bar Type: Reinforced Bar + Stainless Steel Plate
Scope: living room, kitchen, bathroom, bathroom
Precautions:
1, this package only contains the mop set, the picture does not contain any decorative items.
2, due to manual measurement size may have 1 ~ 3cm error, please understand
3, due to lighting, display / contrast settings, products and pictures have subtle chromatic aberration
100% customer satisfaction:
1,100% genuine, if you have any questions about this product, please contact us in time, we will reply you within 24 hours (including holidays)
2, transportation time 7~21 days
in next 2 weeks
